When setting up your project, try to avoid using negative stories. We should have our mesh created on the Zero story and the first constructed floor goes on Story one. The number of the Story really doesn’t matter.
Think of it this way, If we have six stories of basement that we have to create, the lowest basement story, is most likely to be the first slab poured so it goes on the first story